| Color | Gray |
| Storage temperature | +5˚C to +30˚C |
| Packaging | 8 kg bucket (A) + 25 kg kraft bag(B) |
| Shelf life(25˚C 55%RH) | 24 Months(Unopened) |
| Consumption | 4 kg/m² (for 2 mm application thickness) |
| Mortar density | 1,69±0,1 g/cm³ |
| Mixing ratio | 25 : 3 : 8 (Protect 020 2K powder : Protect 020 2K liquid : water) |
| Application thickness | 2-3 mm |
| Number of applicable layers | 2-3 layers |
| Time required between coats | 6 hours |
| Pot life | 45 minutes |
| Time required for top coat application | Min. 7 days |
| Time required for ground filling | Min. 7 days |
| Time required for filling water tanks | Min. 7 days (positive pressure) Min. 14 days (negative pressure) |
[wpdm_package id=’2392′]