+90 (312) 939 86 92 Monday - Saturday 08:00 - 18:00 (GMT+3) Next Level A Blok Kat T No:3C1-160 Çankaya-Ankara, TR

PROTECT-A PUR 18 UV

Polyurethane based single component liquid membrane

Technical Specifications

Consumption (Per Layer)0.75-0.90 kg/m²
Viscosity2500-3500 (Brookfield, mPas)
Density1.37-1.42 g/cm³
Drying Time6-8 Hours
Recoating Time12-24 Hours
Service Temperature-40°C to 80°C
Hardness65 (Shore A)
Tensile Strength>5 (N/mm²)-(+23°C)
Elongation (%)≥ %500
Water Vapor Permeation0.8 gr/m² (Per Hour)
Chemical Cure7 days
Packaging25 kg Tin Bucket
Shelf Life12 Months (Unopened)

Description

PROTECT-A PUR 018 UV is a single component polyurethane based liquid membrane.

Area of Use

  • Fiber and gypsum boards.
  • Under floor tiles.
  • Bathrooms.
  • Roofs.
  • Metal or fibrous cement light roofing.
  • Asphalt membranes.
  • As the main waterproofing membrane in carpark waterproofing applications.

Product Features and Advantages

  • Excellent mechanical properties.
  • High resistance against chemical corrosion.
  • After it is cured, it contains no toxic materials.
  • Water vapor permeable.
  • The film layer can breathe effectively preventing moisture build up underneath it.
  • High thermal resistance (can preserve its elasticity up to -40 degrees Celsius)

Application Instructions

  • Application surfaces must be solid. The surface must have a compressive strength of 25N/mm² and a strength of at least 1.5 N/mm² for adhesion testing.
  • Loose, dismantled or dislodged concrete particles on the surface must be cleared.
  • Application surface must be cleared of factors that will affect the adhesion performance, such as oil and paint residues, cement grout residues.
  • In addition, application surfaces should be roughened and wiped with suitable tools and machines.
  • Wiped surfaces should be cleaned of dust using industrial machines.
  • Dust remaining in the surface pores affects the adhesion performance of the product and may cause holes in the coating.
  • For the best results, two (2) coats must be applied allowing a minimum of 6-24 hours of curing time between each coat.

Leave us your info

Please fill in the form to request product samples or for your inquires and we will get back to you.

    Leave a Reply